Rollout Planner

Design The Release Before The Traffic Arrives

A horizontal rollout ladder from Internal through 1%, 5%, 25%, 50%, to 100%. Each rung carries cohort, duration, metrics, error margin, feature-flag status, auto-stop conditions, and a manual confirmer. Exceed the margin and later rungs lock.

Internal 0%
1% 1%
5% 5%
25% 25%
50% 50%
100% 100%
Stop conditions
  • Error rate > 0.5% for 5 minutes → halt at current rung · lock subsequent
  • Migration 2047 verification fails → rollback to 1%
  • Legacy API error spike > 10/min → pause promotion

Currently at 1% · edit duration or cohort to recalculate later rungs · Simulate Progression for the next 24h.

  • Build Rollout Plan — generate ladder from manifest
  • Configure Cohort — set audience per rung
  • Define Stop Condition — attach SLO-based halt rules
  • Simulate Progression — dry-run traffic shift timeline
Green Builds Still Need Context

Promote every build with the context production actually needs.

PromoJade is the Software Release Context Layer between source control, CI/CD, and production — not another pipeline. Know what moves, where it lands, and whether environments agree before traffic arrives.