Rollout Planner
Design The Release Before The Traffic Arrives
A horizontal rollout ladder from Internal through 1%, 5%, 25%, 50%, to 100%. Each rung carries cohort, duration, metrics, error margin, feature-flag status, auto-stop conditions, and a manual confirmer. Exceed the margin and later rungs lock.
Internal
0%
1%
1%
5%
5%
25%
25%
50%
50%
100%
100%
Stop conditions
- Error rate > 0.5% for 5 minutes → halt at current rung · lock subsequent
- Migration 2047 verification fails → rollback to 1%
- Legacy API error spike > 10/min → pause promotion
Currently at 1% · edit duration or cohort to recalculate later rungs · Simulate Progression for the next 24h.
- Build Rollout Plan — generate ladder from manifest
- Configure Cohort — set audience per rung
- Define Stop Condition — attach SLO-based halt rules
- Simulate Progression — dry-run traffic shift timeline
Green Builds Still Need Context
Promote every build with the context production actually needs.
PromoJade is the Software Release Context Layer between source control, CI/CD, and production — not another pipeline. Know what moves, where it lands, and whether environments agree before traffic arrives.